Architecture and Design Atlas

How Space Is Shaped
Sign In
Text size
100%
Theme
Buildings and Structures

Beijing South Railway Station

Transportation Buildings

Beijing South Railway Station occupies a site in southern Beijing, rebuilt in its current form and reopened on 1 August 2008, shortly before that year's Beijing Olympics, after the demolition of an older station on the same site. Designed by the British architecture firm Farrells working with the Tianjin Architecture Design Institute, the building takes an elliptical form intended to evoke a spreading ray or trilobite, its roof punctured by rows of oval skylights that flood the concourse below with natural light. Covering roughly 320,000 square meters, larger in floor area than the Beijing National Stadium built for the same Olympics, it ranks among the largest railway stations in Asia. The station serves as the Beijing terminus for the high-speed Beijing to Tianjin intercity railway and the Beijing to Shanghai high-speed line, trains capable of running at up to 350 kilometers per hour.

Facts
Building Type
Railway Station 1
Location
Fengtai District, Beijing, China 1
Completed Year
2008 1
Classification
Standing Status
Standing 1
Building Type
Building Type (category)
Railway Station 1
Connections

Has Building Type

Uses Element

Source Beijing South railway station, Wikipedia
In the Other Atlases

Located In

Also in Geography Atlas: where this subject is located.

Sources
1. Beijing South railway station, Wikipedia
  • Lead paragraph
    a large railway station in Fengtai District, Beijing
  • Infobox: address
    Yongdingmen Chezhan Lu, Fengtai District, Beijing
  • History section
    opened on 1 August 2008
  • Lead section
    It serves as the terminus for high-speed trains on the Beijing-Tianjin intercity railway and Beijing-Shanghai high-speed Railway which can reach speeds up to 350 km/h (217 mph). CRH night sleepers to and from Shanghai also depart from this station.
  • Uses Element: Steel, Wikipedia article
    It was built from more than 60,000 tons of steel and 490,000 cubic metres (17,304,000 cu ft) of concrete by 4,000 workers in less than three years.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.