Architecture and Design Atlas

How Space Is Shaped
Sign In
Text size
100%
Theme
Buildings and Structures

Howrah Railway Station

Transportation Buildings

Howrah railway station is a major railway station in Howrah, West Bengal, India, across the Hooghly River from Kolkata, and one of the busiest stations on the Indian Railways network. It opened on August 15, 1854 and was rebuilt on December 1, 1905, later electrified in 1957 and converted to 25 kV AC operation in 1968. The station is built at grade with 24 platforms, each between 650 and 700 meters long, serving 25 tracks, and handles roughly 1.8 million passengers a day, jointly operated by the Eastern Railway and South Eastern Railway divisions of Indian Railways.

Facts
Partially Attested
Completed Year
1911 1
The source says the new station building was opened to the public on 1 December 1905 and completed by 1911, so 1911 is an upper bound for completion.
Building Type
Railway Station 1
Location
Howrah, West Bengal, India 1
Classification
Standing Status
Standing 1
Building Type
Building Type (category)
Railway Station 1
Connections

Has Building Type

Entity-backed identity for the building-type enum value this building already carries, resolved to an architecture concept by an explicit value-to-entity map (phase 3 bucket conversion, docs\design_entity_backed_browse_buckets_20260928.md). The building-type fact itself stays on the building unchanged.

In the Other Atlases
Sources
1. Howrah railway station, Wikipedia
  • Lead, first paragraph
    It is the largest and busiest railway complex in India
  • Short description
    Railway station in Howrah, West Bengal, India
  • History, new station building paragraph
    and completed by 1911.
  • Entity description and the lead/infobox of the Wikipedia article
    Howrah railway station is a major railway station in Howrah, West Bengal, India, across the Hooghly River from Kolkata, and one of the busiest stations on the Indian Railways network. It opened on August 15, 1854 and was rebuilt on December 1, 1905, later electrified in 1957 and converted to 25 kV AC operation in 1968. The station is built at grade with 24 platforms, each between 650 and 700 meters long, serving 25 tracks, and handles roughly 1.8 million passengers a day, jointly operated by the Eastern Railway and South Eastern Railway divisions of Indian Railways.
View the Source
Comments (0)
No comments yet. Be the first to share a thought.
Reader Challenges (0)
No disputes yet. Spotted an error or a better source? Open the first one.